SEA CHALLENGER jack-up vessel for the wind industry

SEA CHALLENGER jack-up vessel for the wind industry

september, 2017 - References for Services

Customer: A2SEA A/S

The Project

SEA CHALLENGER, jack-up vessel for the wind industry, Seacabin harbor service team has carried out a renovation project with installation of new galley floor – acrylic based floor system Duracon from Flowcrete. Location Hvide Sande habor.

We assist on

  • Demounting of galley equipment.
  • Demolition of existing galley floor.
  • Grinding and corrosion – treatment of steel construction.
  • Priming of the steal construction.
  • Installation of floor system 50-90 mm trickness with slope to drain.
  • Duracon acrylic based floor system to resist the movements in the construction.
  • Reinstallation off galley equipment

We were on a very tight schedule, on which our experienced
installers managed on-time delivery with a satisfied customer.

Download pdf-File

Send us a message

Use this contact form for general inquiries. We aim to answer these messages within a few hours.